NTPC Renewable Energy has ordered 21 turbines rated at 5.2 MW each for its Khavda project in Gujarat. The Aditya Birla Renewables and Integrum Energy ... This GujjuTicks brief summarizes the headline for local readers; read the full story on the publisher site.
This is a short GujjuTicks summary for discovery. Full reporting and quotes belong to the original publisher.